Existing Conditions

Facility Condition Surveys

Overview

The majority of buildings on the main campus were constructed between 1965 and 1977. What follows is a list of our buildings and the year in which they were constructed. Many of these buildings have major deficiencies and need to be replaced rather than renovated. 

Business & Industry 1971
Humanities & Social Science 1966
Trades & Industry 1966
Occupational Education 1969
Continuing Education (portable) 1968
Human Resources 1969
Lindbloom Student Center 1971
Science, Math, Technology 1974

SBCTC Facilities Condition Survey

In 1989, the SBCTC established a survey process for all state-owned community and technical college facilities at 34 campuses. The intent of the survey is to provide a determination of the physical condition of community and technical college facilities and to identify capital repair project candidates for funding consideration by applying a uniform process system-wide. The first year, the process included a detailed baseline condition survey conducted at each college. Less detailed surveys were conducted in 1991 and 1993. In 1995, a second baseline condition survey was conducted. Survey updates were then conducted in 1997, 1999, 2001, 2003, 2005, and 2007.  

Excerpt from the 2007 SBCTC may be viewed below: